Quebec - Bouchard-Hébert
The Bouchard-Hébert mine closed permanently in February 2005 in accordance with the life-of-mine plan.
Breakwater
has 215 claims totaling 7,982 hectares surrounding Bouchard-Hébert’s
two mining leases. For 2006 Breakwater has budgeted $2.9 million to
carry out ground and airborne geophysics and diamond drilling along
with downhole geophysical surveying. The Bouchard-Hébert property
covers 18 kilometres of strike length within the Blake River Group of
volcanic rocks which has hosted numerous world-class massive sulphide
and gold deposits.
We expect to spend $3.8 million on
reclamation in 2006, at which time it is anticipated reclamation
activities will be 65% complete. The mill at Bouchard-Hébert will
remain in place pending the outcome of the exploration program
described above.